OEM/ODM Steel Tube/pipe Fabrication For Prefab Steel Workshop Prefabricated

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Shandong
Validity to: Long-term effective
Last update: 2017-07-03 11:59
Browse the number: 168
inquiry
Company Profile
 
 
Product details


Key advantage:

 

1)Top client: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil etc.

2)90% exported to 40 countries like Germany, America, Slovakia,Saudi Arabia, South Africa, Oman etc.Total weight 400,000tons.

3)Certificate:

ISO9000, ISO14000, ISO18000 by BV France        

EN-1090 CE certificate

American CWI

European TWI

European IWE

 

1.We are adopting the world most advanced structural software.

The structural steelwork industry is a high pressure environment facing ever greater challenges due to shorter lead-times requiring a pro-active and collaborative response, we utilises the very latest in 3-D modelling and design analysis software providing us with the ability to fully integrate with clients individual design teams effectively managing detailing, fabrication and erection of all steel structures including commercial, residential, retail, industrial, stadia, local authority, government and military buildings.

 

2.Our inner ERP system greatly improve our efficiency

An internal bogey system enables a significant reduction in the number of occasions material needs to be handled, this, in conjunction with both the latest machines and IT software delivers what we believe to be one of the most efficient workshops in the country.

All operatives are fully trained and welders coded to ensure consistently high standards.

 

3.PRE-ENGINEERED BUILDINGS IS MADE UP OF

Primary members (columns and rafters)

Secondary members (purlins, girts and eave struts) which are cold-formed “Z” and “C” shaped members or open web joists

Roof and wall sheeting connected to each other

 

4.Erection:

Upon arrival of steelwork on-site, erection will commence, based on the agreed phasing and programme sequence in accordance with our method statement and risk assessments etc. Where applicable, we will also supply and install additional items such as metal decking, precast/steel stairs, precast planks and edge protection. All erection work, including these additional services, is carried-out by our own multi-tasked in-house erection squads, ensuring that there is minimal impact to our clients in the event of re-phasing. All operatives are trained to a high standard resulting in our 100% achievement of CSCS certification.

 

5.Our professional logistics team

Our company is committed to minimising its impact on the environment and so amongst the fleet are some of the lowest emissions vehicles possible and we are continually looking to replace our fleet with the latest fuel efficient options.

We operate an extensive fleet of vehicles including:

- Artic Units

- Low Loaders

- Extendable Trailers

- Hi-ab Lorries

- Flatbed Lorries

- Pick Up’s

 

6.Project case:

Structural Steel Logistics Warehouse

This logistics warehouse is constructed for Hisense,it’s located in Qingdao,China.total area is 40,000m2.

Our company takes 22 days in total to finish the area of 20,000m2,it’s a miracle in the field of steel structure construction,and we got high reputation from our customer.

1).Roof use V760 type 0.6mm steel sheet with 75mm glass wool and attaching veneer.

2).Wall use V840 type 0.6mm steel sheet

3).Skylight panel on roof

4).Ventilator on roof

 

7. We have been involved in“pipe fabrication”supply for many years.

It has different names like below:

steel tube fabrication

steel pipe fabrication

we have very good reputation in this field all over the world.



Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]